United States

Re.: https://mediumwave.info/2024/10/29/united-states-742/
Ben Dawson updates us on WFME:
“The actual physical installation work for WFME was performed by Tom Ray (formerly D of E for WOR) and Kurt Gorman, President of Phasetek, who between them did the installation work.  We used some hardware from the old WFME site in the Bronx, and a bit of new hardware from Phasetek, and Kurt redesigned (with a bit of help from me) the old 1530 equipment that was once used at the WPAT site when that frequency was in use there.”

Paul Flanagan to mwcircle iog (2024-10-31)